Customer Success Stories
> Several Brief Case Studies
Design & Fabrication
Case Study
An Automobile Paint
Plant
Modules Used: CADPIPE
Commercial
Results:
-0% Material Waste on project.
-130 fabrication drawings done.
-Contractor awarded bonus for finishing ahead of schedule.
-Fabrication done in Ohio, Installation done with local labor.
Manpower:
2
CADPIPE Operators.
Time frame:
3
Months.
Industrial Case Study
$7 Million Refinery
Document Upgrade Project employing Aerial Photogrammetry
Modules Used: CADPIPE
P&ID, CADPIPE 3D Design
Results:
-1,004 P&ID Drawings.
-1,500 Pipelines in 10 3D models.
Manpower:
4
CADPIPE Operators.
Time frame:
6
Months.
Industrial Case Study
$150 Million Recycling
Facility Project
Modules Used: CADPIPE
ORTHO, CADPIPE ISO
Results:
-80 Plan, Elevation, and Detail Drawings.
-1,360 Automatic Isometric Spools.
Manpower:
3
CADPIPE Operators.
Time frame:
3
1/2 Months.
Commercial Pipe Case Study
$30 Million East Side
Reservoir Project
Modules Used: CADPIPE
Commercial
Results:
-3D Model Created
-160 Plan, Elevation, and Detail Drawings.
-30 Automatic Isometric Spools.
Manpower:
3
CADPIPE Operators.
Time frame:
3
1/2 Months